Fire Hydrant Replacement Update

 


We are hoping to have the 3 new fire hydrants installed within the next 3 weeks.  That is the window that our installer is aiming for.

We will try to give everyone as much notice as possible so you have time to store water. 

Some areas of the subdivision will have the water shut off for this installation.  They hope to complete the job in 1 day.

Those who lose water pressure will be under a boil water advisory once the pressure is restored.

See previous blog posts on our website for details on this repair. FranklinKnollsHOA.com 


Thanks

This entry was posted in Uncategorized. Bookmark the permalink.